{
  "name": "Powered land for data centers",
  "url": "https://poweredlandlist.com/",
  "license": "CC BY 4.0",
  "cite": "Powered Land List, https://poweredlandlist.com/",
  "updated": "2026-11-11",
  "fields": [
    {
      "key": "location",
      "label": "Location",
      "type": "string",
      "description": "Published city or county and state.",
      "sortable": true
    },
    {
      "key": "state",
      "label": "State",
      "type": "enum",
      "description": "US state containing the property.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "Arizona",
        "California",
        "Colorado",
        "Connecticut",
        "Florida",
        "Georgia",
        "Idaho",
        "Illinois",
        "Iowa",
        "Kansas",
        "Missouri",
        "Nevada",
        "New York",
        "North Carolina",
        "Ohio",
        "Oklahoma",
        "Pennsylvania",
        "Texas",
        "Utah",
        "Virginia"
      ]
    },
    {
      "key": "iso",
      "label": "Grid operator",
      "type": "enum",
      "description": "Grid operator (ISO/RTO) when the source names it.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "CAISO",
        "ERCOT",
        "ISO-NE",
        "MISO",
        "NYISO",
        "PJM",
        "SPP"
      ]
    },
    {
      "key": "marketer",
      "label": "Marketing party",
      "type": "string",
      "description": "Developer or brokerage publishing this opportunity; not necessarily the owner.",
      "sortable": true
    },
    {
      "key": "offering",
      "label": "Offering",
      "type": "enum",
      "description": "Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "For sale",
        "For lease",
        "Sale or lease",
        "Developer inquiry",
        "Terms on inquiry",
        "Under contract",
        "Sold"
      ]
    },
    {
      "key": "site_status",
      "label": "Published status",
      "type": "string",
      "description": "Status on the marketing page. Availability of land does not establish availability of power.",
      "sortable": true
    },
    {
      "key": "acres",
      "label": "Land",
      "type": "number",
      "unit": "acres",
      "description": "Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.",
      "sortable": true
    },
    {
      "key": "acreage_note",
      "label": "Acreage basis",
      "type": "string",
      "description": "Scope, approximation or usable-area qualification attached to the published acreage.",
      "sortable": true
    },
    {
      "key": "mw",
      "label": "Stated capacity",
      "type": "number",
      "unit": "MW",
      "description": "Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.",
      "sortable": true
    },
    {
      "key": "power_basis",
      "label": "Power basis",
      "type": "string",
      "description": "What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.",
      "sortable": true
    },
    {
      "key": "utility",
      "label": "Utility",
      "type": "string",
      "description": "Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.",
      "sortable": true
    },
    {
      "key": "power_timing",
      "label": "Power timing",
      "type": "string",
      "description": "Published energization target or relative delivery claim, preserved as written rather than converted into a new date.",
      "sortable": true
    },
    {
      "key": "zoning",
      "label": "Zoning / entitlement",
      "type": "string",
      "description": "Published zoning or approval status; verify the applicable parcel and permitted use with the authority.",
      "sortable": true
    },
    {
      "key": "infrastructure",
      "label": "Infrastructure",
      "type": "string",
      "description": "Published transmission, substation, water or fiber details.",
      "sortable": true
    },
    {
      "key": "price_usd",
      "label": "Asking price",
      "type": "money",
      "unit": "USD",
      "description": "Published total asking price in US dollars. Empty means no public numeric asking price was verified.",
      "sortable": true
    }
  ],
  "records": [
    {
      "id": "spink-street",
      "name": "2100 Spink Street",
      "url": "https://www.cushmanwakefield.com/en/united-states/properties/for-sale/land/ga/atlanta/2100-spink-street/s121427152s121427152-s",
      "summary": "An infill Atlanta parcel marketed for data center development. The brochure identifies transmission easements; a numeric power allocation is not published.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Atlanta, Georgia",
        "state": "Georgia",
        "iso": null,
        "marketer": "Cushman & Wakefield",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 16.15,
        "acreage_note": "Total listed acreage",
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": "Industrial",
        "infrastructure": "City of Atlanta water and sewer; Georgia Power easement with two 230 kV lines and one 115 kV line",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cushmanwakefield.com/en/united-states/properties/for-sale/land/ga/atlanta/2100-spink-street/s121427152s121427152-s",
          "title": "2100 Spink Street — Cushman & Wakefield",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "zoning"
          ]
        },
        {
          "url": "https://assets.cushmanwakefield.com/-/pmedia/226547/0/2100_spink_street_brochure_final.pdf?rev=539ebbe0221e483915a147cd828149ccd7f0c5e79b5cf50ed26ae2a737b695690e8704c9b246d686dcbf8dacf1efcc936d443b0b2a4b8a1878f4c14fb1818d46",
          "title": "Cushman & Wakefield — Spink Street brochure",
          "accessed": "2026-11-11",
          "fields": [
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "thor-lagrange",
      "name": "411 Pegasus Parkway (Thor Equities)",
      "url": "https://www.datacenterdynamics.com/en/news/thor-equities-buys-270-acres-in-georgia-for-data-center/",
      "summary": "Thor Equities bought a 270-acre LaGrange parcel with a 506,220 sq ft building, a dedicated 100 MVA substation and 50 MW of in-place power for a data campus.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "LaGrange, Georgia",
        "state": "Georgia",
        "iso": null,
        "marketer": "Thor Equities, buyer",
        "offering": "Sold",
        "site_status": "Acquired by Thor Equities, reported Aug 2024",
        "acres": 270,
        "acreage_note": null,
        "mw": 50,
        "power_basis": "In-place power output per buyer",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Dedicated 100 MVA substation; water, sewer and gas in place",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/thor-equities-buys-270-acres-in-georgia-for-data-center/",
          "title": "Thor Equities buys 270 acres in Georgia for data center — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "canoe-creek",
      "name": "5300 North Canoe Creek Road",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-207878/5300-north-canoe-creek-road-kenansville-fl-34739",
      "summary": "An Osceola County tract with a smaller developable footprint. CBRE describes a completed initial load study and mixed grid and on-site generation.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Kenansville, Florida",
        "state": "Florida",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 2232,
        "acreage_note": "Gross area; 1,066 developable acres",
        "mw": null,
        "power_basis": "Initial load study complete; updated study pending in listing; MW not published",
        "utility": "Duke Energy",
        "power_timing": "Early 2028 target using on-site generation and grid power",
        "zoning": null,
        "infrastructure": "Dual-circuit 230 kV lines; permitted water resources",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-207878/5300-north-canoe-creek-road-kenansville-fl-34739",
          "title": "5300 North Canoe Creek Road — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "power_basis",
            "utility",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "circle-drive",
      "name": "8700 Circle Drive",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-206024/8700-circle-drive-rural-hall-nc-27045",
      "summary": "An early-stage site seeking buyer input on power and site planning. Rezoning and the initial load study are underway.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Rural Hall, North Carolina",
        "state": "North Carolina",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 143,
        "acreage_note": "Total listed acreage",
        "mw": null,
        "power_basis": "Initial load study funded and underway; no MW published",
        "utility": null,
        "power_timing": null,
        "zoning": "Rezoning underway",
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-206024/8700-circle-drive-rural-hall-nc-27045",
          "title": "8700 Circle Drive — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "power_basis",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-altoona",
      "name": "Altoona Technology Park",
      "url": "https://www.tract.com/project/altoona/",
      "summary": "A Des Moines-region campus with a development agreement. Tract describes utility studies and a water reservation.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "Altoona / Des Moines region, Iowa",
        "state": "Iowa",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 468,
        "acreage_note": "Total project acreage",
        "mw": 1000,
        "power_basis": "Developer capacity supported by utility studies",
        "utility": null,
        "power_timing": null,
        "zoning": "By-right data center zoning",
        "infrastructure": "Development agreement; 588,000 gallons per day water reservation",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/altoona/",
          "title": "Altoona Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "novva-apex",
      "name": "Apex Industrial Park parcel (Novva)",
      "url": "https://www.datacenterdynamics.com/en/news/switch-buys-176-acres-at-apex-industrial-park-las-vegas/",
      "summary": "Novva Data Centers paid $181 million for 205 acres at Apex Industrial Park, a higher price per acre than Switch paid at the same park.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "Apex Industrial Park, near Las Vegas, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Novva Data Centers, buyer",
        "offering": "Sold",
        "site_status": "Sold to Novva Data Centers, reported Aug 2025",
        "acres": 205,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": 181000000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/switch-buys-176-acres-at-apex-industrial-park-las-vegas/",
          "title": "Switch buys 176 acres at Apex Industrial Park, Las Vegas — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "switch-apex",
      "name": "Apex Industrial Park parcel (Switch)",
      "url": "https://www.datacenterdynamics.com/en/news/switch-buys-176-acres-at-apex-industrial-park-las-vegas/",
      "summary": "Switch paid $85.5 million for 176 acres at Apex Industrial Park off Highway 93, northeast of Las Vegas, per property records.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "Apex Industrial Park, near Las Vegas, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Switch, buyer",
        "offering": "Sold",
        "site_status": "Sold to Switch, per property records",
        "acres": 176,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": 85500000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/switch-buys-176-acres-at-apex-industrial-park-las-vegas/",
          "title": "Switch buys 176 acres at Apex Industrial Park, Las Vegas — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-applewhite",
      "name": "Applewhite Technology Park",
      "url": "https://www.tract.com/project/applewhite/",
      "summary": "Industrial land on the south side of San Antonio. The stated capacity describes site designs.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "South San Antonio, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 339,
        "acreage_note": "Total project acreage",
        "mw": 720,
        "power_basis": "Site-design capacity",
        "utility": null,
        "power_timing": null,
        "zoning": "MI-1 industrial zoning",
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/applewhite/",
          "title": "Applewhite Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "digital-realty-astra",
      "name": "Astra Enterprise Park (Digital Realty)",
      "url": "https://www.datacenterdynamics.com/en/news/digital-realty-plans-600mw-campus-in-kansas-acquires-investment-firm-columbia-capital/",
      "summary": "Digital Realty paid about $475 million for 1,440 acres of the former Sunflower ammunition plant in De Soto. Evergy agreed to deliver 600 MW by early 2028, rising to 2 GW at full delivery.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "De Soto, Kansas",
        "state": "Kansas",
        "iso": null,
        "marketer": "Sunflower Redevelopment Group, seller",
        "offering": "Sold",
        "site_status": "Sold to Digital Realty, April 2026",
        "acres": 1440,
        "acreage_note": "Phase 1 (Astra North) about 280 acres",
        "mw": 600,
        "power_basis": "Energy service agreement with Evergy; 2 GW at full delivery",
        "utility": "Evergy",
        "power_timing": "600 MW by early 2028",
        "zoning": null,
        "infrastructure": "On-site substation planned; up to nine buildings, 3M sq ft",
        "price_usd": 475000000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/digital-realty-plans-600mw-campus-in-kansas-acquires-investment-firm-columbia-capital/",
          "title": "Digital Realty plans 600MW campus in Kansas — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "power_timing",
            "infrastructure",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "cleanspark-austin-county",
      "name": "Austin County site (CleanSpark)",
      "url": "https://www.datacenterdynamics.com/en/news/cleanspark-acquires-447-acres-for-second-texas-ai-data-center-site/",
      "summary": "CleanSpark bought 271 acres in Austin County with long-term power supply agreements for up to 285 MW for AI, cloud and enterprise workloads.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Austin County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CleanSpark, buyer",
        "offering": "Sold",
        "site_status": "Acquired by CleanSpark, October 2025",
        "acres": 271,
        "acreage_note": null,
        "mw": 285,
        "power_basis": "Long-term power supply agreements per buyer",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/cleanspark-acquires-447-acres-for-second-texas-ai-data-center-site/",
          "title": "CleanSpark acquires 447 acres for second Texas AI data center site — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "blue-spruce-aurora",
      "name": "Blue Spruce (Aurora)",
      "url": "https://baxtel.com/listings/blue-spruce-aurora",
      "summary": "A 2,000-acre single-owner campus in the Aurora Aerotropolis corridor, 15 minutes from Denver International Airport, with a new 345 kV interconnection path and on-site generation options.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Aurora, Colorado",
        "state": "Colorado",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "For sale",
        "site_status": "Listed for sale (updated Oct 18, 2026)",
        "acres": 2000,
        "acreage_note": null,
        "mw": 250,
        "power_basis": "Listing headline; power program under diligence",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "New 345 kV interconnection path; Colorado Interstate Gas nearby; Zayo fiber",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/blue-spruce-aurora",
          "title": "Blue Spruce - Aurora — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "boulder-brownfield-campus",
      "name": "Boulder brownfield campus",
      "url": "https://baxtel.com/listings/boulder-80-mw-brownfield-campus",
      "summary": "A 460-acre Denver-metro brownfield with about 80 MW energized at the substation today and 98 MW of Xcel service on site. A utility study covers a 400–500 MW second phase by 2030.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Boulder, Colorado",
        "state": "Colorado",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed; sale pending per listing (updated Oct 26, 2026)",
        "acres": 464,
        "acreage_note": "About 460 acres",
        "mw": 80,
        "power_basis": "Energized at the substation; 98 MW utility service on site",
        "utility": "Xcel Energy",
        "power_timing": "Energized today; 500 MW grid-connected by 2030 with a tenant-funded line upgrade",
        "zoning": "By-right commercial / industrial, City of Boulder",
        "infrastructure": "Operating data center buildings; 40,000 MMBtu/day gas; 4 fiber carriers",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/boulder-80-mw-brownfield-campus",
          "title": "Boulder ~80 MW Brownfield Campus — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "cleanspark-brazoria",
      "name": "Brazoria County site (CleanSpark)",
      "url": "https://www.datacenterdynamics.com/en/news/cleanspark-acquires-447-acres-for-second-texas-ai-data-center-site/",
      "summary": "CleanSpark agreed to buy 447 acres with a long-term transmission facilities extension agreement for a 300 MW demand load, expandable to 600 MW.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Brazoria County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CleanSpark, buyer",
        "offering": "Under contract",
        "site_status": "Acquisition agreed; closing expected Q1 2026",
        "acres": 447,
        "acreage_note": null,
        "mw": 300,
        "power_basis": "Transmission facilities extension agreement for 300 MW demand load; potential 600 MW",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Transmission-level power",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/cleanspark-acquires-447-acres-for-second-texas-ai-data-center-site/",
          "title": "CleanSpark acquires 447 acres for second Texas AI data center site — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-buckeye",
      "name": "Buckeye Technology Park",
      "url": "https://www.tract.com/project/buckeye/",
      "summary": "A multi-parcel development west of Phoenix. Tract publishes a campus capacity figure and by-right data center use.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Buckeye, Arizona",
        "state": "Arizona",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 2019,
        "acreage_note": "Total project acreage",
        "mw": 1800,
        "power_basis": "Developer campus capacity; delivery basis not specified",
        "utility": null,
        "power_timing": null,
        "zoning": "By-right data center use",
        "infrastructure": "22 parcels of 44–242 acres",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/buckeye/",
          "title": "Buckeye Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-caldwellvalley",
      "name": "Caldwell Valley",
      "url": "https://www.tract.com/project/caldwellvalley/",
      "summary": "A large campus development between Austin and San Antonio, located at power, gas and fiber infrastructure.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "Between Austin and San Antonio, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 2973,
        "acreage_note": "Total project acreage",
        "mw": 4000,
        "power_basis": "Developer campus capacity; site energization target",
        "utility": null,
        "power_timing": "Site energization in 2028",
        "zoning": null,
        "infrastructure": "345 kV transmission; Kinder Morgan Permian Highway gas pipeline; long-haul fiber",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/caldwellvalley/",
          "title": "Caldwell Valley — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "colchester-18-mw",
      "name": "Colchester 18 MW fuel-cell site",
      "url": "https://baxtel.com/listings/colchester-18-mws",
      "summary": "A 17-acre Connecticut site with an 18 MW on-site generation facility permitted for Bloom fuel cells, offered on a $1 a year ground lease with power sold from $0.15/kWh.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Colchester, Connecticut",
        "state": "Connecticut",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed (updated Oct 3, 2026)",
        "acres": 17,
        "acreage_note": null,
        "mw": 18,
        "power_basis": "Permitted on-site natural gas fuel cells; power sold under a PPA from $0.15/kWh",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "40,000 sq ft data center pad; multiple fiber providers",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/colchester-18-mws",
          "title": "Colchester 18 MWs — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "commercial-point",
      "name": "Commercial Point Data Campus",
      "url": "https://property.jll.com/listings/bldg-1-9086-state-route-104-columbus",
      "summary": "JLL markets buildings within a proposed Lockbourne campus for sale or lease. Its energy headline describes on-site turbine generation rather than a utility allocation.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Lockbourne, Ohio",
        "state": "Ohio",
        "iso": null,
        "marketer": "JLL",
        "offering": "Sale or lease",
        "site_status": "Marketed for sale and lease",
        "acres": null,
        "acreage_note": null,
        "mw": 1300,
        "power_basis": "Broker claim for campus on-site natural gas turbine generation with hydrogen supplementation",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Five data centers advertised; building 1 offered at 220,000 sq ft",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://property.jll.com/listings/bldg-1-9086-state-route-104-columbus",
          "title": "Commercial Point Data Campus — JLL",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "terravolt-cassia",
      "name": "Declo campus (TerraVolt)",
      "url": "https://www.globenewswire.com/news-release/2026/10/30/3392188/0/en/terravolt-holdings-secures-option-on-1-077-acre-site-in-idaho-for-240-mw-gas-powered-data-center-campus.html",
      "summary": "TerraVolt holds options on 1,077 acres outside Declo for an off-grid campus with an initial 240 MW of on-site gas generation, and plans to sell building sites to operators.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Declo, Cassia County, Idaho",
        "state": "Idaho",
        "iso": null,
        "marketer": "TerraVolt Holdings",
        "offering": "For sale",
        "site_status": "Option agreements executed Oct 30, 2026; building-site sales planned",
        "acres": 1077,
        "acreage_note": null,
        "mw": 240,
        "power_basis": "Planned islanded on-site gas generation",
        "utility": null,
        "power_timing": null,
        "zoning": "Multiple-Use",
        "infrastructure": "Firm gas supply of 55,000 MMBtu/day; along SH 81 near I-84 and the Williams Northwest Pipeline",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.globenewswire.com/news-release/2026/10/30/3392188/0/en/terravolt-holdings-secures-option-on-1-077-acre-site-in-idaho-for-240-mw-gas-powered-data-center-campus.html",
          "title": "TerraVolt Holdings Secures Option on 1,077-Acre Site in Idaho — GlobeNewswire",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "del-rio-powered-land",
      "name": "Del Rio powered land",
      "url": "https://baxtel.com/listings/del-rio-tx-100mw-to-1-3gw",
      "summary": "Nearly 12,000 acres about 40 miles from Del Rio with 100 MW of grid power available now and transmission studies toward 1.3 GW. Sold whole or split.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Near Del Rio, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed (updated Nov 8, 2026)",
        "acres": 11950,
        "acreage_note": null,
        "mw": 100,
        "power_basis": "Grid power available immediately per listing; transmission studies (not load studies) toward 1.3 GW",
        "utility": null,
        "power_timing": null,
        "zoning": "Industrial, cleared for data center development",
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/del-rio-tx-100mw-to-1-3gw",
          "title": "Del Rio, TX: 100MW to 1.3GW — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "downtown-dallas-10-mw",
      "name": "Downtown Dallas 10 MW infill",
      "url": "https://baxtel.com/listings/downtown-dallas-10-mw-powered-land",
      "summary": "An 11.5-acre infill parcel about 4 miles from downtown Dallas with 10 MW of secured power in two 5 MW tranches and 30 MW more requested for about 2028.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Dallas, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed for lease, sale or JV (updated Oct 18, 2026)",
        "acres": 11.5,
        "acreage_note": null,
        "mw": 10,
        "power_basis": "Secured utility power; additional 30 MW requested",
        "utility": null,
        "power_timing": "Two near-term 5 MW tranches; 30 MW about 2028",
        "zoning": "IM / IR industrial; data centers by right today",
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/downtown-dallas-10-mw-powered-land",
          "title": "Downtown Dallas 10 MW - Powered Land — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "power_timing",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "elk-grove-84-acres",
      "name": "Elk Grove 84 acres",
      "url": "https://baxtel.com/listings/elk-grove-ca-84-acres",
      "summary": "An 84-acre Sacramento-area parcel listed at $12.5 million, with a $10 million lease already in place on 20 acres holding battery storage. Part of the site is in the floodplain.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "Elk Grove, California",
        "state": "California",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "For sale",
        "site_status": "Listed; JV preferred, sale of whole parcel considered (updated Oct 18, 2026)",
        "acres": 84,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Installed battery storage on a leased 20 acres; partly in floodplain",
        "price_usd": 12500000
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/elk-grove-ca-84-acres",
          "title": "Elk Grove, CA (84 Acres) — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "infrastructure",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "georgetown-tx-25-mw",
      "name": "Georgetown 25 MW site",
      "url": "https://baxtel.com/listings/georgetown-tx-25-mw",
      "summary": "A 10-acre Georgetown site north of Austin marketed as a 25 MW opportunity, offered as land, shell or turnkey, with a 50% property-tax abatement for 10 years.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Georgetown, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed for sale, lease or JV (updated Nov 6, 2026)",
        "acres": 10,
        "acreage_note": null,
        "mw": 13,
        "power_basis": "Listing figure; headline 25 MW",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Property tax abatement 50% for 10 years",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/georgetown-tx-25-mw",
          "title": "Georgetown, TX (25 MW) — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "power_basis",
            "infrastructure"
          ]
        },
        {
          "url": "https://baxtel.com/listings",
          "title": "Data Center Listings — Baxtel",
          "accessed": "2026-11-11",
          "fields": [
            "acres",
            "mw"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "microsoft-goodyear-100-acres",
      "name": "Goodyear expansion land (Microsoft)",
      "url": "https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/",
      "summary": "Microsoft paid $131 million for 100 acres near Citrus and Indian School roads, next to its Goodyear campus. The seller was First Industrial Realty Trust.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "Goodyear, Maricopa County, Arizona",
        "state": "Arizona",
        "iso": null,
        "marketer": "First Industrial Realty Trust, seller",
        "offering": "Sold",
        "site_status": "Sold to Microsoft, reported 2026",
        "acres": 100,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": 131000000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/",
          "title": "Microsoft purchases 100 acres next to existing data center campus in Goodyear, Arizona — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-hanover",
      "name": "Hanover Technology Park",
      "url": "https://www.tract.com/project/hanover/",
      "summary": "A 1,211-acre Tract park on the I-95 corridor near Ashland, Virginia, with an existing transmission corridor and gas pipeline. Tract states up to 2,400 MW across eight Dominion Energy substations.",
      "tags": [
        "East",
        "Campus"
      ],
      "fields": {
        "location": "Ashland, Hanover County, Virginia",
        "state": "Virginia",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 1211,
        "acreage_note": "Total; 5 parcels of 153–318 acres",
        "mw": 2400,
        "power_basis": "Up to 2,400 MW across 8 substations per developer",
        "utility": "Dominion Energy",
        "power_timing": null,
        "zoning": "M-1 Limited Industrial, by-right data center use, up to 110 ft",
        "infrastructure": "Existing utility transmission corridor and natural gas pipeline",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/hanover/",
          "title": "Hanover — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "childress-highway-287",
      "name": "Highway 287 — Childress",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-185112/unique-power-infrastructure-highway-287-childress-tx-79201",
      "summary": "A Texas Panhandle land offering near transmission infrastructure. The published listing describes access to power without a quantified allocation.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Childress, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 950,
        "acreage_note": "Approximately 950 acres",
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Nearby 345 kV and 138 kV transmission; access to Tesla substation per broker",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-185112/unique-power-infrastructure-highway-287-childress-tx-79201",
          "title": "Highway 287 — Childress — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "hood-county-big-digital",
      "name": "Hood County powered industrial site",
      "url": "https://www.datacenterdynamics.com/en/news/big-digital-energy-acquires-land-for-311mw-data-center-campus-outside-dallas-fort-worth-texas/",
      "summary": "A 50-acre Hood County site with 17 MW of operational power and 30,000 sq ft of buildings. Big Digital Energy and 10NetZero signed a letter of intent; the site could reach 311 MW with behind-the-meter gas.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Hood County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Big Digital Energy / 10NetZero, buyers",
        "offering": "Under contract",
        "site_status": "Letter of intent to acquire 50% interest, reported July 2026",
        "acres": 50,
        "acreage_note": null,
        "mw": 17,
        "power_basis": "Operational power; reportedly upgradable to 111 MW grid, 311 MW with on-site gas",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "More than 30,000 sq ft of existing structures",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/big-digital-energy-acquires-land-for-311mw-data-center-campus-outside-dallas-fort-worth-texas/",
          "title": "Big Digital Energy acquires land for 311MW data center campus outside Dallas-Fort Worth — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "labadie",
      "name": "Labadie Powered Land",
      "url": "https://www.five9sdigital.com/data-centers/",
      "summary": "A Missouri powered-land opportunity on Five 9s Digital’s available-properties page. The broker says the power study is complete and rezoning is needed.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Labadie, Missouri",
        "state": "Missouri",
        "iso": null,
        "marketer": "Five 9s Digital",
        "offering": "Terms on inquiry",
        "site_status": "Listed among available powered land sites",
        "acres": null,
        "acreage_note": null,
        "mw": 500,
        "power_basis": "500+ MW broker headline; power study completed",
        "utility": null,
        "power_timing": null,
        "zoning": "Rezoning needed",
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.five9sdigital.com/data-centers/",
          "title": "Labadie Powered Land — Five 9s Digital",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "mw",
            "power_basis",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "mara-matagorda",
      "name": "Matagorda County powered site (Mara)",
      "url": "https://www.datacenterdynamics.com/en/news/mara-acquires-1200-acre-texas-site-from-hif-usa-for-up-to-2gw-data-center-campus/",
      "summary": "Mara signed to buy a 1,200-acre powered site about 90 miles from Houston from HIF USA. It expects up to 1 GW of grid capacity by October 2027 and 2 GW by April 2028.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Matagorda County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "HIF USA, seller",
        "offering": "Under contract",
        "site_status": "Purchase agreement signed by Mara, reported July 2026",
        "acres": 1200,
        "acreage_note": "More than 1,200 acres",
        "mw": 1000,
        "power_basis": "Grid capacity expected per buyer; up to 2 GW by April 2028",
        "utility": null,
        "power_timing": "Up to 1 GW by October 2027",
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/mara-acquires-1200-acre-texas-site-from-hif-usa-for-up-to-2gw-data-center-campus/",
          "title": "Mara acquires 1,200-acre Texas site from HIF USA for up to 2GW data center campus — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-medina-technology-park",
      "name": "Medina Technology Park",
      "url": "https://www.tract.com/project/medina-technology-park/",
      "summary": "A campus adjacent to an existing Microsoft development. The project page identifies its electric cooperative and a power target.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "Castroville / San Antonio region, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 265,
        "acreage_note": "Total project acreage",
        "mw": 500,
        "power_basis": "Developer campus capacity; site energization target",
        "utility": "Medina Electric Cooperative",
        "power_timing": "Site energization mid-2028",
        "zoning": null,
        "infrastructure": "East Medina County SUD water service",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/medina-technology-park/",
          "title": "Medina Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-morris-technology-park",
      "name": "Morris Technology Park",
      "url": "https://www.tract.com/project/morris-technology-park/",
      "summary": "An entitled campus along the I-80 corridor. The developer describes a power ramp rather than an immediately available gigawatt.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "I-80 corridor southwest of Chicago, Illinois",
        "state": "Illinois",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 344,
        "acreage_note": "Total project acreage",
        "mw": 1000,
        "power_basis": "Developer load-ramp target",
        "utility": null,
        "power_timing": "Ramp to 1 GW in 4 years; start date not stated",
        "zoning": "By-right data center use; no height restrictions",
        "infrastructure": "345 kV and 765 kV lines on site; secured water and sewer capacity",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/morris-technology-park/",
          "title": "Morris Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "core-scientific-muskogee",
      "name": "Muskogee expansion site (Core Scientific)",
      "url": "https://www.datacenterdynamics.com/en/news/core-scientific-acquires-cryptomine-in-muskogee-to-expand-ai-data-center-campus/",
      "summary": "Core Scientific is buying Polaris DS: 40 acres next to its Muskogee facility, an on-site substation and 440 MW of gross power contracted with OG&E.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Muskogee, Muskogee County, Oklahoma",
        "state": "Oklahoma",
        "iso": null,
        "marketer": "Polaris DS, seller",
        "offering": "Under contract",
        "site_status": "Acquisition agreed by Core Scientific, reported May 2026",
        "acres": 40,
        "acreage_note": null,
        "mw": 440,
        "power_basis": "Gross power contracted and used under an energy agreement",
        "utility": "Oklahoma Gas & Electric",
        "power_timing": null,
        "zoning": null,
        "infrastructure": "On-site substation",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/core-scientific-acquires-cryptomine-in-muskogee-to-expand-ai-data-center-campus/",
          "title": "Core Scientific acquires cryptomine in Muskogee to expand AI data center campus — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "utility",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "north-florida",
      "name": "North Florida Data Center Site",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-191925/north-florida-data-center-site-east-palatka-fl-135-gilbert-road-east-palatka-fl-32131",
      "summary": "A Putnam County tract offered as a whole, with a smaller usable upland area. The utility and third-party study figures have different bases.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "East Palatka, Florida",
        "state": "Florida",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 1317,
        "acreage_note": "Gross area; approximately 525 usable upland acres",
        "mw": 400,
        "power_basis": "At least 400 MW confirmed by FPL per CBRE; separate 2025 study indicates 1.4 GW offtake",
        "utility": "Florida Power & Light",
        "power_timing": null,
        "zoning": "AC agricultural; PUD rezoning in process",
        "infrastructure": "Near wastewater treatment plant and local / long-haul fiber",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-191925/north-florida-data-center-site-east-palatka-fl-135-gilbert-road-east-palatka-fl-32131",
          "title": "North Florida Data Center Site — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "north-forsyth",
      "name": "North Forsyth Industrial Park",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-206023/north-forsyth-industrial-park-king-tobaccoville-road-tobaccoville-nc-27050",
      "summary": "A divisible industrial site beside transmission and a substation. CBRE identifies the utility but publishes no MW allocation.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Tobaccoville, North Carolina",
        "state": "North Carolina",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 313,
        "acreage_note": "Gross site; offered from 68 to 313 acres",
        "mw": null,
        "power_basis": null,
        "utility": "Duke Energy",
        "power_timing": null,
        "zoning": "General Industrial (GI)",
        "infrastructure": "Dual-circuit 230 kV and single-circuit 100 kV lines adjacent to Reynolds Tobaccoville substation",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-206023/north-forsyth-industrial-park-king-tobaccoville-road-tobaccoville-nc-27050",
          "title": "North Forsyth Industrial Park — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "utility",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "pa1-findlay-imperial",
      "name": "PA1 Findlay / Imperial campus",
      "url": "https://baxtel.com/listings/pa1-findlay-imperial",
      "summary": "A 115.9-acre campus 4 miles from Pittsburgh International Airport, anchored by behind-the-meter gas. The plan totals 1,240 MW by 2030; a 13-acre first phase is marketed at 30–100 MW.",
      "tags": [
        "East",
        "Campus"
      ],
      "fields": {
        "location": "Findlay Township, Allegheny County, Pennsylvania",
        "state": "Pennsylvania",
        "iso": "PJM",
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed for sale or JV (updated Nov 4, 2026)",
        "acres": 115.9,
        "acreage_note": "51-acre data center subdivision platted July 2026",
        "mw": 1240,
        "power_basis": "Campus plan; up to 600 MW on-site gas and hydrogen generation plus batteries and solar",
        "utility": null,
        "power_timing": "First capacity Q4 2027 at the earliest, likely Q1 2028",
        "zoning": null,
        "infrastructure": "116 MMCF/d gas verified by TC Energy at the tap; executed Peoples Gas supply for phase 1",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/pa1-findlay-imperial",
          "title": "PA1 (Findlay / Imperial) — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "iso",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-peru-ridge",
      "name": "Peru Ridge Technology Park",
      "url": "https://www.tract.com/project/peru-ridge/",
      "summary": "A two-parcel development adjoining Peru Shelf. A graded pad and published building allowances distinguish this parcel.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Tahoe-Reno Industrial Center, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 517,
        "acreage_note": "Total project acreage",
        "mw": 230,
        "power_basis": "Developer campus capacity; delivery basis not specified",
        "utility": null,
        "power_timing": null,
        "zoning": "By-right data center use; 125 ft height allowance",
        "infrastructure": "40-acre graded pad expandable to over 100 acres; two parcels",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/peru-ridge/",
          "title": "Peru Ridge Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-peru-shelf",
      "name": "Peru Shelf Technology Park",
      "url": "https://www.tract.com/project/peru-shelf/",
      "summary": "A Tahoe-Reno Industrial Center development with construction power and a published site energization target.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Storey County, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 686,
        "acreage_note": "Total project acreage",
        "mw": 810,
        "power_basis": "Utility capacity at full buildout, per developer",
        "utility": "NV Energy",
        "power_timing": "Site energization February 2027; construction power available immediately",
        "zoning": "By-right data center use; 125 ft height allowance",
        "infrastructure": "Parcels from 183 to 277 acres",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/peru-shelf/",
          "title": "Peru Shelf Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        },
        {
          "url": "https://www.tract.com/news/tract-breaks-ground-on-peru-shelf-technology-park-in-storey-county-nevada/",
          "title": "Tract — Peru Shelf groundbreaking, April 30, 2024",
          "accessed": "2026-11-11",
          "fields": [
            "utility",
            "power_basis"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "petersburg-va-300-mw",
      "name": "Petersburg 93-acre powered parcel",
      "url": "https://baxtel.com/listings/petersburg-va-93-ac-300-mw",
      "summary": "A 93-acre parcel south of Richmond, entitled for data centers, with 230 kV transmission on site and an executed Dominion letter of agreement for a 300 MW load. Asking $69.75 million.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Petersburg area, Virginia",
        "state": "Virginia",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed; sale preferred, lease or build-to-suit open (updated Oct 18, 2026)",
        "acres": 93,
        "acreage_note": null,
        "mw": 300,
        "power_basis": "Executed Dominion letter of agreement for the load; substation design commenced",
        "utility": "Dominion Energy",
        "power_timing": null,
        "zoning": "Light Industrial, fully entitled for data center use",
        "infrastructure": "230 kV transmission on site",
        "price_usd": 69750000
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/petersburg-va-93-ac-300-mw",
          "title": "Petersburg, VA (93 ac / 300 MW) — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "utility",
            "zoning",
            "infrastructure",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-pole-canyon-technology-tract",
      "name": "Pole Canyon Technology Park",
      "url": "https://www.tract.com/project/pole-canyon-technology-tract/",
      "summary": "A master-planned campus in Eagle Mountain with by-right data center use and subdivided campus parcels.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Eagle Mountain, Utah",
        "state": "Utah",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 844,
        "acreage_note": "Total project acreage",
        "mw": 1700,
        "power_basis": "Developer campus capacity; delivery basis not specified",
        "utility": null,
        "power_timing": null,
        "zoning": "Industrial zoning; by-right data center use",
        "infrastructure": "18 parcels of 40–74 acres; master-planned power, water and network infrastructure",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/pole-canyon-technology-tract/",
          "title": "Pole Canyon Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-pony-express",
      "name": "Pony Express Technology Park",
      "url": "https://www.tract.com/project/pony-express-technology-tract/",
      "summary": "A 225-acre Tract park in Eagle Mountain, Utah, next to the Meta, Google and QTS campuses. Zoned industrial with by-right data center use and bordered by 345 kV lines.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Eagle Mountain, Utah",
        "state": "Utah",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 225,
        "acreage_note": "Total; 4 parcels of 45–90 acres",
        "mw": 120,
        "power_basis": "Developer campus capacity",
        "utility": null,
        "power_timing": null,
        "zoning": "Industrial, by-right data center use; Eagle Mountain RTI overlay",
        "infrastructure": "Bordered by 345 kV transmission lines",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/pony-express-technology-tract/",
          "title": "Pony Express — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "cloverleaf-open-sky",
      "name": "Project Open Sky (Cloverleaf)",
      "url": "https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/",
      "summary": "Cloverleaf Infrastructure filed annexation and rezoning applications with Piedmont for a 633-acre campus of six 352,800 sq ft buildings and a substation.",
      "tags": [
        "Central",
        "Campus"
      ],
      "fields": {
        "location": "Piedmont, Canadian County, Oklahoma",
        "state": "Oklahoma",
        "iso": null,
        "marketer": "Cloverleaf Infrastructure",
        "offering": "Developer inquiry",
        "site_status": "Annexation and rezoning applications filed",
        "acres": 633,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": "Rezoning application filed with City of Piedmont",
        "infrastructure": "Substation in site plan",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/",
          "title": "Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "project-rocket",
      "name": "Project Rocket",
      "url": "https://www.cbre.com/properties/properties-for-lease/datacenter/details/US-SMPL-210914/immediate-texas-data-center-opportunity-25-acres-cleared-and-platted-for-designated-50mw-use-houston-tx-00000",
      "summary": "A cleared Houston parcel with a broker-described CenterPoint engineering plan. Expansion is studied separately from the initial capacity.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Houston, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 25,
        "acreage_note": "Cleared and platted parcel within a larger 100+ acre site",
        "mw": 50,
        "power_basis": "CenterPoint-studied capacity per CBRE; 250 MW expansion pathway studied separately",
        "utility": "CenterPoint Energy",
        "power_timing": "Mid-2027 target",
        "zoning": "No rezoning or special use permit required, per broker",
        "infrastructure": "138 kV transmission 0.7 miles from site; nearby fiber",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/datacenter/details/US-SMPL-210914/immediate-texas-data-center-opportunity-25-acres-cleared-and-platted-for-designated-50mw-use-houston-tx-00000",
          "title": "Project Rocket — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "project-venus",
      "name": "Project Venus",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-205527/immediate-data-center-opportunity-southern-dallas-venus-tx-76084",
      "summary": "A southern Dallas-area tract with a broker-described Oncor facility extension agreement. Larger future capacity depends on further agreements.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Venus, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 700,
        "acreage_note": "Total listed acreage",
        "mw": 150,
        "power_basis": "150 MW Oncor FEA per broker; further FEAs pending toward 2,400 MW",
        "utility": "Oncor",
        "power_timing": null,
        "zoning": "No rezoning or special use permit required, per broker",
        "infrastructure": "345 kV line crosses site; on-site switching station under construction; 12-inch gas pipeline",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-205527/immediate-data-center-opportunity-southern-dallas-venus-tx-76084",
          "title": "Project Venus — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "project-zebulon",
      "name": "Project Zebulon",
      "url": "https://baxtel.com/listings/project-zebulon-colorado-springs",
      "summary": "About 1,300 owned acres in El Paso County planned around islanded gas generation: bridge power up to 300 MW targeted for Q1 2028 and a permanent plant in Q1 2029.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "El Paso County, Colorado",
        "state": "Colorado",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed for sale, lease or JV (updated Oct 4, 2026)",
        "acres": 1300,
        "acreage_note": "Carve-outs from about 100 acres",
        "mw": 300,
        "power_basis": "Planned behind-the-meter gas bridge power; about 500 MW gas extension, up to 1 GW potential",
        "utility": null,
        "power_timing": "Bridge power about Q1 2028; permanent plant about Q1 2029, after entitlement",
        "zoning": "Agricultural (A-35); rezoning to industrial in process, not expected before 2027",
        "infrastructure": "16-inch lateral off Colorado Interstate Gas planned; Zayo fiber build",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/project-zebulon-colorado-springs",
          "title": "Project Zebulon (Colorado Springs) — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "proximity-park",
      "name": "Proximity Park",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-175817/proximity-park-kingman-road-montana-avenue-ottawa-ks-66067",
      "summary": "A development site southwest of Kansas City. The broker headline states capacity but does not explain the power agreement or delivery date.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Ottawa, Kansas",
        "state": "Kansas",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 250,
        "acreage_note": "Approximately 250 acres",
        "mw": 440,
        "power_basis": "Broker development headline; utility and delivery basis not stated",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-175817/proximity-park-kingman-road-montana-avenue-ottawa-ks-66067",
          "title": "Proximity Park — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "microsoft-pataskala",
      "name": "Refugee Road parcels (Microsoft)",
      "url": "https://www.datacenterdynamics.com/en/news/microsoft-acquires-37-acres-in-licking-county-ohio/",
      "summary": "Microsoft paid about $6.65 million for 37 more acres on Refugee Road in Pataskala, taking its Licking County holdings past 700 acres.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Pataskala, Licking County, Ohio",
        "state": "Ohio",
        "iso": null,
        "marketer": "Microsoft, buyer",
        "offering": "Sold",
        "site_status": "Sold to Microsoft, reported Oct 2026",
        "acres": 37,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": 6650000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-acquires-37-acres-in-licking-county-ohio/",
          "title": "Microsoft acquires 37 acres in Licking County, Ohio — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "qts-salem-township",
      "name": "Salem Township assemblage (QTS)",
      "url": "https://thecrereport.substack.com/p/inside-the-586-million-deal-that",
      "summary": "Ninety-six Salem Township families agreed in March 2026 to sell about 1,700 acres to Blackstone-owned QTS for $586 million combined, more than $330,000 an acre, near the Susquehanna nuclear plant.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Salem Township, Luzerne County, Pennsylvania",
        "state": "Pennsylvania",
        "iso": null,
        "marketer": "96 landowner families, sellers",
        "offering": "Under contract",
        "site_status": "Sale agreements signed with QTS, March 2026",
        "acres": 1700,
        "acreage_note": "About 1,700 acres",
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Near major transmission lines and the Susquehanna nuclear plant",
        "price_usd": 586000000
      },
      "sources": [
        {
          "url": "https://thecrereport.substack.com/p/inside-the-586-million-deal-that",
          "title": "Inside the $586 Million Deal That Bought 1,700 Acres of Pennsylvania Farmland — The CRE Report",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "infrastructure",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-sapphire",
      "name": "Sapphire Technology Park",
      "url": "https://www.tract.com/project/sapphire/",
      "summary": "A campus near Silver Springs with a development agreement. Its capacity remains under utility study in the developer description.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Silver Springs, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 1063,
        "acreage_note": "Total project acreage",
        "mw": 700,
        "power_basis": "Under utility study",
        "utility": null,
        "power_timing": null,
        "zoning": "Administrative approvals for substations; zoning standards described as favorable",
        "infrastructure": "Existing development agreement",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/sapphire/",
          "title": "Sapphire Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "waxahachie",
      "name": "South of Dallas — Waxahachie",
      "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-124710/new-ercot-approved-power-upgrades-south-of-dallas-waxahachie-tx-75167",
      "summary": "A large Ellis County site with broker-described ERCOT-approved transmission upgrades. No numeric MW allocation is stated.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Unincorporated Waxahachie, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 600,
        "acreage_note": "More than 600 acres; numeric value is the advertised lower bound",
        "mw": null,
        "power_basis": "138 kV and 345 kV upgrades described as ERCOT approved by broker; no MW allocation",
        "utility": "Oncor",
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Water agreement with Sardis; TPDES sewer permit; more than ten adjacent fiber networks",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/properties/properties-for-lease/commercial-space/details/US-SMPL-124710/new-ercot-approved-power-upgrades-south-of-dallas-waxahachie-tx-75167",
          "title": "South of Dallas — Waxahachie — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "power_basis",
            "utility",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-south-valley",
      "name": "South Valley Technology Park",
      "url": "https://www.tract.com/project/south-valley/",
      "summary": "A multi-campus project along transmission routes in Storey County. Tract publishes a substation specification and energization target.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Storey County, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 1534,
        "acreage_note": "Total project acreage",
        "mw": 1215,
        "power_basis": "Developer campus capacity; site energization target",
        "utility": null,
        "power_timing": "Site energization September 2027; construction power stated available in 2025",
        "zoning": null,
        "infrastructure": "On-site 525/345 kV substation; seven parcels of 70–641 acres",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/south-valley/",
          "title": "South Valley Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "black-mountain-san-antonio",
      "name": "State Highway 16 tract (Black Mountain Power)",
      "url": "https://www.datacenterdynamics.com/en/news/black-mountain-power-buys-432-acres-in-san-antonio-texas/",
      "summary": "Black Mountain Power bought 432 acres at State Highway 16 and Lone Star Pass for its Texas powered-land strategy. The seller, Ballard Exploration, financed about $64.5 million.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "San Antonio, Bexar County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Ballard Exploration Co., seller",
        "offering": "Sold",
        "site_status": "Sold to Black Mountain Power, per Bexar County records",
        "acres": 432,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/black-mountain-power-buys-432-acres-in-san-antonio-texas/",
          "title": "Black Mountain Power buys 432 acres in San Antonio, Texas — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "flexential-talty",
      "name": "Talty campus land (Flexential)",
      "url": "https://www.datacenterdynamics.com/en/news/flexential-acquires-110-acres-outside-dallas-texas-for-108mw-data-center-campus/",
      "summary": "Flexential bought 110 acres in Talty, Kaufman County, for three 36 MW buildings. Work starts early 2027 for a late-2028 launch.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Talty, Kaufman County, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Flexential, buyer",
        "offering": "Sold",
        "site_status": "Acquired by Flexential, announced July 2026",
        "acres": 110,
        "acreage_note": null,
        "mw": 108,
        "power_basis": "Planned campus capacity at full build-out (3 × 36 MW)",
        "utility": null,
        "power_timing": "First phase launch late 2028",
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/flexential-acquires-110-acres-outside-dallas-texas-for-108mw-data-center-campus/",
          "title": "Flexential acquires 110 acres outside Dallas, Texas, for 108MW data center campus — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "power_timing"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "taylor-tx-20-60-mw",
      "name": "Taylor 20–60 MW site",
      "url": "https://baxtel.com/listings/taylor-tx-20-60mws",
      "summary": "A 35-acre Taylor site northeast of Austin marketed at 20 MW scaling to 60 MW, offered as land, shell or turnkey, with a 50% property-tax abatement for 10 years.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Taylor, Texas",
        "state": "Texas",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "Sale or lease",
        "site_status": "Listed for sale, lease or JV (updated Nov 6, 2026)",
        "acres": 35,
        "acreage_note": null,
        "mw": 40,
        "power_basis": "Listing figure; headline 20 MW scaling to 60 MW",
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": "Property tax abatement 50% for 10 years",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/taylor-tx-20-60mws",
          "title": "Taylor, TX 20->60MWs — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "power_basis",
            "infrastructure"
          ]
        },
        {
          "url": "https://baxtel.com/listings",
          "title": "Data Center Listings — Baxtel",
          "accessed": "2026-11-11",
          "fields": [
            "acres",
            "mw"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tierpoint-tekpark",
      "name": "TekPark campus (TierPoint)",
      "url": "https://www.datacenterdynamics.com/en/news/tierpoint-acquires-leased-data-center-site-in-pennsylvania-plans-100mw-expansion/",
      "summary": "TierPoint bought the 137-acre TekPark campus in Breinigsville, outside Allentown, with its 16 MW data center, and started a 100 MW power expansion due in the second half of 2026.",
      "tags": [
        "East",
        "Campus"
      ],
      "fields": {
        "location": "Breinigsville, Pennsylvania",
        "state": "Pennsylvania",
        "iso": null,
        "marketer": "TierPoint, buyer",
        "offering": "Sold",
        "site_status": "Acquired by TierPoint; terms undisclosed",
        "acres": 137,
        "acreage_note": null,
        "mw": 100,
        "power_basis": "Power expansion under way; existing data center about 16 MW",
        "utility": null,
        "power_timing": "Expansion due H2 2026",
        "zoning": null,
        "infrastructure": "122,000 sq ft data center at 9999 Hamilton Boulevard",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-acquires-leased-data-center-site-in-pennsylvania-plans-100mw-expansion/",
          "title": "TierPoint acquires leased data center site in Pennsylvania, plans 100MW expansion — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "power_timing",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "twin-creeks-leesburg",
      "name": "Twin Creeks Assemblage",
      "url": "https://www.datacenterdynamics.com/en/news/sdc-capital-partners-buys-97-acres-of-data-center-zoned-land-in-virginia-for-615-million/",
      "summary": "An SDC Capital Partners affiliate paid $615.05 million, about $6.3 million an acre, for 97 Leesburg acres zoned for up to five data centers with an on-site substation.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Leesburg, Loudoun County, Virginia",
        "state": "Virginia",
        "iso": null,
        "marketer": "JK Land Holdings, seller",
        "offering": "Sold",
        "site_status": "Sold to SDC Capital Partners affiliate, per property records",
        "acres": 97,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": "Approved for up to five two-story data centers, 1.6M sq ft",
        "infrastructure": "On-site substation",
        "price_usd": 615050000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/sdc-capital-partners-buys-97-acres-of-data-center-zoned-land-in-virginia-for-615-million/",
          "title": "SDC Capital Partners buys 97 acres of data center-zoned land in Virginia for $615 million — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "tract-virginia-highlands",
      "name": "Virginia Highlands Technology Park",
      "url": "https://www.tract.com/project/virginia-highlands/",
      "summary": "Despite its name, this project is in Nevada. Tract offers multiple large parcels within an industrially zoned development.",
      "tags": [
        "West",
        "Campus"
      ],
      "fields": {
        "location": "Storey County, Nevada",
        "state": "Nevada",
        "iso": null,
        "marketer": "Tract",
        "offering": "Developer inquiry",
        "site_status": "Owned and in development",
        "acres": 8590,
        "acreage_note": "Total project acreage",
        "mw": 2500,
        "power_basis": "Developer campus capacity; delivery basis not specified",
        "utility": null,
        "power_timing": null,
        "zoning": "Industrial zoning",
        "infrastructure": "11 parcels of 250–1,200 acres",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.tract.com/project/virginia-highlands/",
          "title": "Virginia Highlands Technology Park — Tract",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "west-central-ohio-514-ac",
      "name": "West-central Ohio 514-acre assemblage",
      "url": "https://baxtel.com/listings/west-central-oh-514-ac-gas-grid-land",
      "summary": "A 514-acre assemblage with 350 MW of committed behind-the-meter gas from January 2028 and a utility study resubmitted at 400 MW. A dual 345 kV backbone crosses the site.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "West-central Ohio",
        "state": "Ohio",
        "iso": null,
        "marketer": "Baxtel listing (owner confidential)",
        "offering": "For sale",
        "site_status": "Listed for sale; divisible (updated Nov 8, 2026)",
        "acres": 514,
        "acreage_note": "164-acre core plus about 350 acres under option; about 140 net buildable",
        "mw": 350,
        "power_basis": "Committed behind-the-meter gas; grid study resubmitted at 400 MW",
        "utility": null,
        "power_timing": "Gas from 2028-01-01; grid study results expected about Q4 2026",
        "zoning": "I-1 Industrial, data centers by right (164-acre core)",
        "infrastructure": "Dual 345 kV backbone crosses the site; municipal water and sewer",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://baxtel.com/listings/west-central-oh-514-ac-gas-grid-land",
          "title": "West-Central OH 514 ac Gas+Grid Land — Baxtel listing",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "power_timing",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "microsoft-woodward-iowa",
      "name": "Woodward farmland (Microsoft)",
      "url": "https://www.datacenterdynamics.com/en/news/microsoft-buys-616-acres-for-955m-in-dallas-county-iowa/",
      "summary": "Microsoft paid $95.5 million for 616 acres between Highway 141 and Seminole Avenue near Woodward. The seller, a Trammell Crow vehicle, bought the land for $30.7 million the same day.",
      "tags": [
        "Central",
        "Land"
      ],
      "fields": {
        "location": "Woodward, Dallas County, Iowa",
        "state": "Iowa",
        "iso": null,
        "marketer": "TC Austin Acquisitions (Trammell Crow), seller",
        "offering": "Sold",
        "site_status": "Sold to Microsoft, reported Nov 2026",
        "acres": 616,
        "acreage_note": null,
        "mw": null,
        "power_basis": null,
        "utility": null,
        "power_timing": null,
        "zoning": null,
        "infrastructure": null,
        "price_usd": 95500000
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-buys-616-acres-for-955m-in-dallas-county-iowa/",
          "title": "Microsoft buys 616 acres for $95.5m in Dallas County, Iowa — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "price_usd"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "yondr-manassas",
      "name": "Yondr Manassas parcel",
      "url": "https://www.datacenterdynamics.com/en/news/yondr-group-and-cerberus-acquire-40-acres-for-data-center-campus-in-manassas-virginia/",
      "summary": "Yondr and Cerberus bought a 40-acre Manassas parcel for a 72 MW hyperscale campus with a 2029 ready-for-service date.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Manassas, Virginia",
        "state": "Virginia",
        "iso": null,
        "marketer": "Yondr Group / Cerberus, buyers",
        "offering": "Sold",
        "site_status": "Acquired by Yondr and Cerberus; terms undisclosed",
        "acres": 40,
        "acreage_note": null,
        "mw": 72,
        "power_basis": "Planned campus capacity per buyer",
        "utility": null,
        "power_timing": "Operational 2029 per buyer",
        "zoning": null,
        "infrastructure": null,
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/yondr-group-and-cerberus-acquire-40-acres-for-data-center-campus-in-manassas-virginia/",
          "title": "Yondr Group and Cerberus acquire 40 acres for data center campus in Manassas, Virginia — Data Center Dynamics",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "mw",
            "power_basis",
            "power_timing"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "disc-drive",
      "name": "250 Disc Drive",
      "url": "https://www.cbre.com/resources/fileassets/US-SMPL-144674/ac484ef7/38e83bf4-cc9a-4235-a117-7ed681e19b15.pdf",
      "summary": "A former Microsoft and Uber data center site on 8.88 acres in Longmont, marketed for lease with 5 MW immediately and up to 12 MW. Both public listings date from 2024–2025.",
      "tags": [
        "West",
        "Land"
      ],
      "fields": {
        "location": "Longmont, Colorado",
        "state": "Colorado",
        "iso": null,
        "marketer": "CBRE",
        "offering": "For lease",
        "site_status": "Lease listings dated 2024 (CBRE) and April 2025 (Kenai, 5–12 MW); not on Kenai's current listings page",
        "acres": 8.88,
        "acreage_note": "Lot size per Kenai Capital Advisors",
        "mw": 5,
        "power_basis": "Existing supply described as immediately available in 2024 brochure",
        "utility": null,
        "power_timing": "2024 brochure: immediate 5 MW; additional 5 MW within six months",
        "zoning": null,
        "infrastructure": "Two 2,500 kVA transformers on site; diverse fiber routes",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://www.cbre.com/resources/fileassets/US-SMPL-144674/ac484ef7/38e83bf4-cc9a-4235-a117-7ed681e19b15.pdf",
          "title": "250 Disc Drive — CBRE",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "mw",
            "power_basis",
            "power_timing",
            "infrastructure"
          ]
        },
        {
          "url": "https://kenaicap.com/property/250-disc-drive/",
          "title": "250 Disc Drive — Kenai Capital Advisors",
          "accessed": "2026-11-11",
          "fields": [
            "acres",
            "acreage_note",
            "site_status"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false,
      "flag": {
        "label": "2024–25 listings",
        "note": "Power and availability come from a 2024 CBRE brochure and an April 2025 Kenai listing; the site is not on Kenai's current listings page. Reconfirm before you tour.",
        "checkedAt": "2026-11-11"
      }
    },
    {
      "id": "hencle-oswego",
      "name": "Hencle / Oswego Road",
      "url": "https://www.cushmanwakefield.com/en/united-states/properties/for-sale/land/ny/baldwinsville/2200-hencle-blvd/y17627-s",
      "summary": "A 124-acre industrially zoned site near Syracuse listed at $60 million. The 300 MW rests on a May 2025 NYISO application that has no published approval, and Lysander adopted a data center moratorium in May 2026.",
      "tags": [
        "East",
        "Land"
      ],
      "fields": {
        "location": "Baldwinsville, New York",
        "state": "New York",
        "iso": null,
        "marketer": "Cushman & Wakefield / Pyramid Brokerage",
        "offering": "For sale",
        "site_status": "Marketed for sale",
        "acres": 124,
        "acreage_note": "Roughly 124 acres, per CNY Signal",
        "mw": 300,
        "power_basis": "NYISO interconnection application for 300 MW filed May 2025 by Ranalli Super DC; assignable per broker; no approval published",
        "utility": null,
        "power_timing": "Listing anticipated approval by April 30, 2026; no approval published as of Nov 11, 2026",
        "zoning": "Industrial; Town of Lysander adopted a data center moratorium in May 2026 (Local Law 4 of 2026)",
        "infrastructure": "Adjacent 345 kV lines; adjacent National Grid gas regulator station (gas, not electric service)",
        "price_usd": 60000000
      },
      "sources": [
        {
          "url": "https://www.cushmanwakefield.com/en/united-states/properties/for-sale/land/ny/baldwinsville/2200-hencle-blvd/y17627-s",
          "title": "Hencle / Oswego Road — Cushman & Wakefield / Pyramid Brokerage",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "mw",
            "power_timing",
            "infrastructure",
            "price_usd"
          ]
        },
        {
          "url": "https://cnysignal.com/lysander-data-center-water-rules-july-17-committee/",
          "title": "Lysander Committee Weighs a No Wells, No Evaporative Cooling Rule for Data Centers — CNY Signal",
          "accessed": "2026-11-11",
          "fields": [
            "acres",
            "acreage_note",
            "power_basis",
            "zoning"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false,
      "flag": {
        "label": "Approval date passed",
        "note": "The listing expected NYISO approval by April 30, 2026; none is published, and the town adopted a data center moratorium in May 2026. Ask the broker for the interconnection status and moratorium end date.",
        "checkedAt": "2026-11-11"
      }
    },
    {
      "id": "stamp-genesee",
      "name": "STAMP (Science & Technology Advanced Manufacturing Park)",
      "url": "https://buffaloniagara.org/wp-content/uploads/GCEDC_STAMP-brochure_2024-1.pdf",
      "summary": "A 1,250-acre county-owned mega-site with 310+ buildable contiguous acres, dual 345 kV bulk transmission and a 600 MW 345/115 kV substation, served by NYPA hydropower and National Grid.",
      "tags": [
        "East",
        "Campus"
      ],
      "fields": {
        "location": "Genesee County, New York",
        "state": "New York",
        "iso": null,
        "marketer": "Genesee County Economic Development Center",
        "offering": "Terms on inquiry",
        "site_status": "Project-ready sites marketed (2024 brochure)",
        "acres": 1250,
        "acreage_note": "310+ buildable acres on a contiguous parcel, plus an 80-acre parcel",
        "mw": 600,
        "power_basis": "Substation capacity; substation under construction in 2024 brochure",
        "utility": "New York Power Authority / National Grid",
        "power_timing": null,
        "zoning": "Industrial (Technology Districts 1–3); site-wide permitting complete",
        "infrastructure": "Dual 345 kV bulk transmission; redundant 115 kV feeders; 24-inch gas line",
        "price_usd": null
      },
      "sources": [
        {
          "url": "https://buffaloniagara.org/wp-content/uploads/GCEDC_STAMP-brochure_2024-1.pdf",
          "title": "STAMP brochure 2024 — Genesee County Economic Development Center",
          "accessed": "2026-11-11",
          "fields": [
            "location",
            "state",
            "marketer",
            "offering",
            "site_status",
            "acres",
            "acreage_note",
            "mw",
            "power_basis",
            "utility",
            "zoning",
            "infrastructure"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false,
      "flag": {
        "label": "2024 brochure",
        "note": "Substation status and available acreage come from the 2024 brochure. Ask GCEDC for current parcels and substation energization.",
        "checkedAt": "2026-11-11"
      }
    }
  ]
}
