Boulder brownfield campus
A 460-acre Denver-metro brownfield with about 80 MW energized at the substation today and 98 MW of Xcel service on site. A utility study covers a 400–500 MW second phase by 2030.
Observed
View official listingCompare nearby optionsRequest site information
Parcel file
Field definitions- Location Published city or county and state.
- Boulder, Colorado 1
- State US state containing the property.
- Colorado 1
- Grid operator Grid operator (ISO/RTO) when the source names it.
- Not published
- Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
- Baxtel listing (owner confidential) 1
- Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
- Sale or lease 1
- Published status Status on the marketing page. Availability of land does not establish availability of power.
- Listed; sale pending per listing (updated Oct 26, 2026) 1
- Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
- 464 1
- Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
- About 460 acres 1
- Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
- 80 1
- Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
- Energized at the substation; 98 MW utility service on site 1
- Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
- Xcel Energy 1
- Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
- Energized today; 500 MW grid-connected by 2030 with a tenant-funded line upgrade 1
- Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
- By-right commercial / industrial, City of Boulder 1
- Infrastructure Published transmission, substation, water or fiber details.
- Operating data center buildings; 40,000 MMBtu/day gas; 4 fiber carriers 1
- Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.