Western US powered land for data centers

The West runs from Tract’s Reno and Phoenix campuses to Colorado brownfields and an off-grid Idaho gas campus. Peru Shelf pairs an NV Energy capacity claim with by-right zoning and a February 2027 energization target. Colorado and Idaho sell speed through on-site generation, and Apex Industrial Park sales set the Las Vegas price per acre.

17 site files, 13 with a stated MW figure and its basis.

Virginia Highlands Technology ParkStorey County, Nevada12,5001Developer campus capacity; delivery basis not specified18,5901———Developer inquiry12026-11-11
Buckeye Technology ParkBuckeye, Arizona11,8001Developer campus capacity; delivery basis not specified12,0191———Developer inquiry12026-11-11
Pole Canyon Technology ParkEagle Mountain, Utah11,7001Developer campus capacity; delivery basis not specified18441———Developer inquiry12026-11-11
South Valley Technology ParkStorey County, Nevada11,2151Developer campus capacity; site energization target11,5341——Site energization September 2027; construction power stated available in 20251Developer inquiry12026-11-11
Peru Shelf Technology ParkStorey County, Nevada18101Utility capacity at full buildout, per developer26861—NV Energy2Site energization February 2027; construction power available immediately1Developer inquiry12026-11-11
Sapphire Technology ParkSilver Springs, Nevada17001Under utility study11,0631———Developer inquiry12026-11-11
Project ZebulonEl Paso County, Colorado13001Planned behind-the-meter gas bridge power; about 500 MW gas extension, up to 1 GW potential11,3001——Bridge power about Q1 2028; permanent plant about Q1 2029, after entitlement1Sale or lease12026-11-11
Blue Spruce (Aurora)Aurora, Colorado12501Listing headline; power program under diligence12,0001———For sale12026-11-11
Declo campus (TerraVolt)Declo, Cassia County, Idaho12401Planned islanded on-site gas generation11,0771———For sale12026-11-11
Peru Ridge Technology ParkTahoe-Reno Industrial Center, Nevada12301Developer campus capacity; delivery basis not specified15171———Developer inquiry12026-11-11
Pony Express Technology ParkEagle Mountain, Utah11201Developer campus capacity12251———Developer inquiry12026-11-11
Boulder brownfield campusBoulder, Colorado1801Energized at the substation; 98 MW utility service on site14641—Xcel Energy1Energized today; 500 MW grid-connected by 2030 with a tenant-funded line upgrade1Sale or lease12026-11-11
Apex Industrial Park parcel (Novva)Apex Industrial Park, near Las Vegas, Nevada1——2051$181,000,0001——Sold12026-11-11
Apex Industrial Park parcel (Switch)Apex Industrial Park, near Las Vegas, Nevada1——1761$85,500,0001——Sold12026-11-11
Elk Grove 84 acresElk Grove, California1——841$12,500,0001——For sale12026-11-11
Goodyear expansion land (Microsoft)Goodyear, Maricopa County, Arizona1——1001$131,000,0001——Sold12026-11-11
250 Disc Drive2024–25 listingsLongmont, Colorado151Existing supply described as immediately available in 2024 brochure18.882——2024 brochure: immediate 5 MW; additional 5 MW within six months1For lease12026-11-11

Check the parcel-level load ramp

A campus headline can span several parcels and delivery phases. Ask for the allocation, utility agreement and substation delivery schedule for the parcel you intend to buy.

Read the field definitions and sourcing rules, or download the full dataset.

More shortlists

Full tracker