STAMP (Science & Technology Advanced Manufacturing Park)

A 1,250-acre county-owned mega-site with 310+ buildable contiguous acres, dual 345 kV bulk transmission and a 600 MW 345/115 kV substation, served by NYPA hydropower and National Grid.

Genesee County, New York

Observed

2024 brochure. Substation status and available acreage come from the 2024 brochure. Ask GCEDC for current parcels and substation energization.

View official listingCompare nearby optionsRequest site information

Location Published city or county and state.
Genesee County, New York 1
State US state containing the property.
New York 1
Grid operator Grid operator (ISO/RTO) when the source names it.
Not published
Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
Genesee County Economic Development Center 1
Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
Terms on inquiry 1
Published status Status on the marketing page. Availability of land does not establish availability of power.
Project-ready sites marketed (2024 brochure) 1
Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
1,250 1
Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
310+ buildable acres on a contiguous parcel, plus an 80-acre parcel 1
Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
600 1
Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
Substation capacity; substation under construction in 2024 brochure 1
Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
New York Power Authority / National Grid 1
Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
Not published
Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
Industrial (Technology Districts 1–3); site-wide permitting complete 1
Infrastructure Published transmission, substation, water or fiber details.
Dual 345 kV bulk transmission; redundant 115 kV feeders; 24-inch gas line 1
Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.
Not published