Eastern US powered land for data centers
The East pairs Virginia’s priciest land, $6.3 million an acre in Leesburg, with a 300 MW Dominion-backed parcel outside Richmond. Pennsylvania and Ohio offer gas-backed campuses and 1,700-acre assemblages. Florida, the Carolinas and New York add transmission-side tracts and a county mega-site on a 600 MW substation.
19 site files, 12 with a stated MW figure and its basis.
| Hanover Technology Park | Ashland, Hanover County, Virginia1 | 2,4001 | Up to 2,400 MW across 8 substations per developer1 | 1,2111 | — | Dominion Energy1 | — | Developer inquiry1 | 2026-11-11 |
|---|---|---|---|---|---|---|---|---|---|
| Commercial Point Data Campus | Lockbourne, Ohio1 | 1,3001 | Broker claim for campus on-site natural gas turbine generation with hydrogen supplementation1 | — | — | — | — | Sale or lease1 | 2026-11-11 |
| PA1 Findlay / Imperial campus | Findlay Township, Allegheny County, Pennsylvania1 | 1,2401 | Campus plan; up to 600 MW on-site gas and hydrogen generation plus batteries and solar1 | 115.91 | — | — | First capacity Q4 2027 at the earliest, likely Q1 20281 | Sale or lease1 | 2026-11-11 |
| North Florida Data Center Site | East Palatka, Florida1 | 4001 | At least 400 MW confirmed by FPL per CBRE; separate 2025 study indicates 1.4 GW offtake1 | 1,3171 | — | Florida Power & Light1 | — | For sale1 | 2026-11-11 |
| West-central Ohio 514-acre assemblage | West-central Ohio1 | 3501 | Committed behind-the-meter gas; grid study resubmitted at 400 MW1 | 5141 | — | — | Gas from 2028-01-01; grid study results expected about Q4 20261 | For sale1 | 2026-11-11 |
| Petersburg 93-acre powered parcel | Petersburg area, Virginia1 | 3001 | Executed Dominion letter of agreement for the load; substation design commenced1 | 931 | $69,750,0001 | Dominion Energy1 | — | Sale or lease1 | 2026-11-11 |
| TekPark campus (TierPoint) | Breinigsville, Pennsylvania1 | 1001 | Power expansion under way; existing data center about 16 MW1 | 1371 | — | — | Expansion due H2 20261 | Sold1 | 2026-11-11 |
| Yondr Manassas parcel | Manassas, Virginia1 | 721 | Planned campus capacity per buyer1 | 401 | — | — | Operational 2029 per buyer1 | Sold1 | 2026-11-11 |
| 411 Pegasus Parkway (Thor Equities) | LaGrange, Georgia1 | 501 | In-place power output per buyer1 | 2701 | — | — | — | Sold1 | 2026-11-11 |
| Colchester 18 MW fuel-cell site | Colchester, Connecticut1 | 181 | Permitted on-site natural gas fuel cells; power sold under a PPA from $0.15/kWh1 | 171 | — | — | — | Sale or lease1 | 2026-11-11 |
| 2100 Spink Street | Atlanta, Georgia1 | — | — | 16.151 | — | — | — | For sale1 | 2026-11-11 |
| 5300 North Canoe Creek Road | Kenansville, Florida1 | — | Initial load study complete; updated study pending in listing; MW not published1 | 2,2321 | — | Duke Energy1 | Early 2028 target using on-site generation and grid power1 | For sale1 | 2026-11-11 |
| 8700 Circle Drive | Rural Hall, North Carolina1 | — | Initial load study funded and underway; no MW published1 | 1431 | — | — | — | For sale1 | 2026-11-11 |
| North Forsyth Industrial Park | Tobaccoville, North Carolina1 | — | — | 3131 | — | Duke Energy1 | — | For sale1 | 2026-11-11 |
| Refugee Road parcels (Microsoft) | Pataskala, Licking County, Ohio1 | — | — | 371 | $6,650,0001 | — | — | Sold1 | 2026-11-11 |
| Salem Township assemblage (QTS) | Salem Township, Luzerne County, Pennsylvania1 | — | — | 1,7001 | $586,000,0001 | — | — | Under contract1 | 2026-11-11 |
| Twin Creeks Assemblage | Leesburg, Loudoun County, Virginia1 | — | — | 971 | $615,050,0001 | — | — | Sold1 | 2026-11-11 |
| STAMP (Science & Technology Advanced Manufacturing Park)2024 brochure | Genesee County, New York1 | 6001 | Substation capacity; substation under construction in 2024 brochure1 | 1,2501 | — | New York Power Authority / National Grid1 | — | Terms on inquiry1 | 2026-11-11 |
| Hencle / Oswego RoadApproval date passed | Baldwinsville, New York1 | 3001 | NYISO interconnection application for 300 MW filed May 2025 by Ranalli Super DC; assignable per broker; no approval published2 | 1242 | $60,000,0001 | — | Listing anticipated approval by April 30, 2026; no approval published as of Nov 11, 20261 | For sale1 | 2026-11-11 |
Check usable land and approvals
Request a survey of the buildable footprint and the current zoning decision. For on-site generation, ask for the plant scope, fuel arrangements and permits separately from the data center plans.
Read the field definitions and sourcing rules, or download the full dataset.