DataBank Lithia Springs 95 acres
DataBank bought a 95-acre tract near Lithia Springs for two potential data centers, within half a mile of ATL4.
Observed
Read the deal reportCompare nearby optionsRequest site information
Parcel file
Field definitions- Location Published city or county and state.
- Lithia Springs, Georgia 1
- State US state containing the property.
- Georgia 1
- Grid operator Grid operator (ISO/RTO) when the source names it.
- Not published
- Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
- Not published
- Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
- Sold 1
- Published status Status on the marketing page. Availability of land does not establish availability of power.
- Acquired for data center campus 1
- Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
- 95 1
- Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
- Newly acquired parcel 1
- Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
- 120 1
- Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
- Up to 120 MW critical IT power at full deployment 1
- Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
- Georgia Power 1
- Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
- Not published
- Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
- Not published
- Infrastructure Published transmission, substation, water or fiber details.
- Planned 180 MW onsite substation 1
- Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.
- Not published