250 Disc Drive
A former Microsoft and Uber data center site on 8.88 acres in Longmont, marketed for lease with 5 MW immediately and up to 12 MW. Both public listings date from 2024–2025.
Observed
2024–25 listings. Power and availability come from a 2024 CBRE brochure and an April 2025 Kenai listing; the site is not on Kenai's current listings page. Reconfirm before you tour.
View official listingCompare nearby optionsRequest site information
Parcel file
Field definitions- Location Published city or county and state.
- Longmont, Colorado 1
- State US state containing the property.
- Colorado 1
- Grid operator Grid operator (ISO/RTO) when the source names it.
- Not published
- Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
- CBRE 1
- Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
- For lease 1
- Published status Status on the marketing page. Availability of land does not establish availability of power.
- Lease listings dated 2024 (CBRE) and April 2025 (Kenai, 5–12 MW); not on Kenai's current listings page 2
- Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
- 8.88 2
- Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
- Lot size per Kenai Capital Advisors 2
- Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
- 5 1
- Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
- Existing supply described as immediately available in 2024 brochure 1
- Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
- Not published
- Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
- 2024 brochure: immediate 5 MW; additional 5 MW within six months 1
- Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
- Not published
- Infrastructure Published transmission, substation, water or fiber details.
- Two 2,500 kVA transformers on site; diverse fiber routes 1
- Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.
- Not published