West-central Ohio 514-acre assemblage

A 514-acre assemblage with 350 MW of committed behind-the-meter gas from January 2028 and a utility study resubmitted at 400 MW. A dual 345 kV backbone crosses the site.

West-central Ohio

Observed

View official listingCompare nearby optionsRequest site information

Location Published city or county and state.
West-central Ohio 1
State US state containing the property.
Ohio 1
Grid operator Grid operator (ISO/RTO) when the source names it.
Not published
Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
Baxtel listing (owner confidential) 1
Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
For sale 1
Published status Status on the marketing page. Availability of land does not establish availability of power.
Listed for sale; divisible (updated Nov 8, 2026) 1
Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
514 1
Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
164-acre core plus about 350 acres under option; about 140 net buildable 1
Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
350 1
Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
Committed behind-the-meter gas; grid study resubmitted at 400 MW 1
Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
Not published
Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
Gas from 2028-01-01; grid study results expected about Q4 2026 1
Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
I-1 Industrial, data centers by right (164-acre core) 1
Infrastructure Published transmission, substation, water or fiber details.
Dual 345 kV backbone crosses the site; municipal water and sewer 1
Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.
Not published