TekPark campus (TierPoint)
TierPoint bought the 137-acre TekPark campus in Breinigsville, outside Allentown, with its 16 MW data center, and started a 100 MW power expansion due in the second half of 2026.
Observed
Read the deal reportCompare nearby optionsRequest site information
Parcel file
Field definitions- Location Published city or county and state.
- Breinigsville, Pennsylvania 1
- State US state containing the property.
- Pennsylvania 1
- Grid operator Grid operator (ISO/RTO) when the source names it.
- Not published
- Marketing party Developer or brokerage publishing this opportunity; not necessarily the owner.
- TierPoint, buyer 1
- Offering Advertised or reported transaction. Developer inquiry means the project page invites enquiries without sale or lease terms. Under contract and Sold rows are reported transactions, kept as price and power comparables.
- Sold 1
- Published status Status on the marketing page. Availability of land does not establish availability of power.
- Acquired by TierPoint; terms undisclosed 1
- Land acres Advertised gross acreage, including undevelopable areas unless the acreage note says otherwise.
- 137 1
- Acreage basis Scope, approximation or usable-area qualification attached to the published acreage.
- Not published
- Stated capacity MW Published headline capacity, with its basis in the adjacent column. This is not a normalized IT-load or energized-power measure.
- 100 1
- Power basis What the stated MW represents: design, utility study, agreement, generation or existing supply. All are attributed claims.
- Power expansion under way; existing data center about 16 MW 1
- Utility Electric utility explicitly named by the source. A nearby transmission line does not establish a service agreement.
- Not published
- Power timing Published energization target or relative delivery claim, preserved as written rather than converted into a new date.
- Expansion due H2 2026 1
- Zoning / entitlement Published zoning or approval status; verify the applicable parcel and permitted use with the authority.
- Not published
- Infrastructure Published transmission, substation, water or fiber details.
- 122,000 sq ft data center at 9999 Hamilton Boulevard 1
- Asking price $ Published total asking price in US dollars. Empty means no public numeric asking price was verified.
- Not published