Texas is the deepest market in the register. Near Dallas, Project Venus holds a 150 MW Oncor agreement on 700 acres; in Houston, Project Rocket has 50 MW studied by CenterPoint for mid-2027. Mara’s 1,200-acre Matagorda site targets 1 GW of grid capacity by October 2027.

17 site files, 14 with a stated MW figure and its basis.

Caldwell ValleyBetween Austin and San Antonio, Texas14,0001Developer campus capacity; site energization target12,9731——Site energization in 20281Developer inquiry12026-11-11
Matagorda County powered site (Mara)Matagorda County, Texas11,0001Grid capacity expected per buyer; up to 2 GW by April 202811,2001——Up to 1 GW by October 20271Under contract12026-11-11
Applewhite Technology ParkSouth San Antonio, Texas17201Site-design capacity13391———Developer inquiry12026-11-11
Medina Technology ParkCastroville / San Antonio region, Texas15001Developer campus capacity; site energization target12651—Medina Electric Cooperative1Site energization mid-20281Developer inquiry12026-11-11
Brazoria County site (CleanSpark)Brazoria County, Texas13001Transmission facilities extension agreement for 300 MW demand load; potential 600 MW14471———Under contract12026-11-11
Austin County site (CleanSpark)Austin County, Texas12851Long-term power supply agreements per buyer12711———Sold12026-11-11
Project VenusVenus, Texas11501150 MW Oncor FEA per broker; further FEAs pending toward 2,400 MW17001—Oncor1—For sale12026-11-11
Talty campus land (Flexential)Talty, Kaufman County, Texas11081Planned campus capacity at full build-out (3 × 36 MW)11101——First phase launch late 20281Sold12026-11-11
Del Rio powered landNear Del Rio, Texas11001Grid power available immediately per listing; transmission studies (not load studies) toward 1.3 GW111,9501———Sale or lease12026-11-11
Project RocketHouston, Texas1501CenterPoint-studied capacity per CBRE; 250 MW expansion pathway studied separately1251—CenterPoint Energy1Mid-2027 target1For sale12026-11-11
Taylor 20–60 MW siteTaylor, Texas1402Listing figure; headline 20 MW scaling to 60 MW1352———Sale or lease12026-11-11
Hood County powered industrial siteHood County, Texas1171Operational power; reportedly upgradable to 111 MW grid, 311 MW with on-site gas1501———Under contract12026-11-11
Georgetown 25 MW siteGeorgetown, Texas1132Listing figure; headline 25 MW1102———Sale or lease12026-11-11
Downtown Dallas 10 MW infillDallas, Texas1101Secured utility power; additional 30 MW requested111.51——Two near-term 5 MW tranches; 30 MW about 20281Sale or lease12026-11-11
Highway 287 — ChildressChildress, Texas1——9501———For sale12026-11-11
South of Dallas — WaxahachieUnincorporated Waxahachie, Texas1—138 kV and 345 kV upgrades described as ERCOT approved by broker; no MW allocation16001—Oncor1—For sale12026-11-11
State Highway 16 tract (Black Mountain Power)San Antonio, Bexar County, Texas1——4321———Sold12026-11-11